Skip to content
Katalyze announces $10.5M seed round. Read the press release
ConnectorsData platforms

Neo4j

Available

Connect graph knowledge to operational work.

Bring relevant information from an existing Neo4j graph into the context used for a defined Katalyze operational job.

  • reads
  • moves
  • publishes
Neo4j
Batch BR-0412Feed lot 2231-BBioreactor, 2000 LFeed supplierCertificate 0091
In the Context LayerBatch BR-0412
From Neo4j
Used
Feed lot 2231-B
Ran on
Bioreactor, 2000 L
From Document Intelligence
Feed 3
11:40, planned 09:00
Deviation noted
DV-0088
Document IntelligenceBR-0412 feeding record
The connection

What the connection makes available.

  1. 01

    Reads the graph you have

    Nodes, relationships and their properties, read with Cypher through a read-only role over an encrypted link.

  2. 02

    Keeps genealogy intact

    A lot's path from supplier to batch arrives as the relationships your graph already draws, not rebuilt.

  3. 03

    Maps to your Ontology

    Your labels and relationship types are mapped to the Ontology built for your operation, so both graphs agree.

  4. 04

    Follows every change

    Change events bring each new or changed node and relationship into the Context Layer as it happens.

Plan the connection

Plan the connection around the work.

Review what the connection reads, the information your team needs, and the access the job requires.

KindData platforms
StateAvailable
Doesreads
DirectoryConnectors directory
Prepare for setup

Identify the source and the people responsible.

  1. 01The graph to discussIdentify the graph and information relevant to the intended use.
  2. 02The model and access ownersInclude people who understand the graph structure and its access requirements.
  3. 03The operational useExplain how the graph information should contribute to the defined job.
Information scope

The information available through this connection.

Use this information to build operational context, with pointers to its original sources.

  • 01

    Batches

    BR-0410 to BR-0421

  • 02

    Materials

    Feed lots 2231-A and 2231-B

  • 03

    Equipment

    Production bioreactor, 2000 L

  • 04

    Suppliers

    The feed supplier

  • 05

    Documents

    Certificates 0088 and 0091

  • 06

    Relationship types

    Used, ran on, supplied, covers

  • 07

    Properties

    Dates, sites and states

  • 08

    Change events

    A new lot or a corrected record

Questions

Questions about Neo4j.

Discuss the information you need and how your team will use it.

Book a Demo
Book a demo

Turn time spent finding information into time spent moving forward.

Bring the job you want to move forward and the records you'd like connected. Thirty minutes on how Katalyze would do the work, and where your experts come in.

Or, just a quick chat to run through the product, your call.